In the aeronautical lighting construction, we adopted LED lights and developed the base, resulting in the implementation of “High-cost performance aeronautical lights.”
As a result, construction took approximately one year, including basic facilities and runway. A reduction of approximately 20% in project expenses was achieved.
Moreover, we also achieved a life-cycle cost reduction after the second runway opening, as we implemented a "Pavement Management System" (PMS) that enables us to do preventive maintenance. For a more detailed description, refer to the table below.